Park Hyatt



Location: Park Hyatt, Wynyard Quarter, Auckland
Client:
Scope: POU Fixing Brackets, Gutter Fabrication
Metal Mart was proud to support the construction of the luxury Park Hyatt Auckland by supplying precision metalwork for key architectural and service components. Situated on the waterfront in Wynyard Quarter, the project required the highest standard of finish, accuracy, and performance across all trades.
Our scope included the supply of custom-fabricated fixing brackets for point-of-use (POU) plumbing units. These were manufactured to exact tolerances to suit wall build-ups and fixture alignment, helping ensure seamless installation for specialist trades. All brackets were prepared in-house with close attention to mounting positions and finish quality.
Additionally, we fabricated and supplied gutter components for targeted areas of the development. These were produced to meet both drainage and visual integration requirements, with materials and profiles tailored to the project’s detailed specifications.
This project demonstrates Metal Mart’s ability to contribute to premium, design-led developments with accuracy and reliability. Whether behind the scenes or part of the finished architectural envelope, we ensure every component supports the overall quality and performance of the build.